Preparing for inspection

Written by Ivan on May 27th, 2008

Last seven days were really busy. Result is amazing though. Interior works are mostly done, with just a few details remaining – like some of door handles are not  yet installed. Ventilation system was finished and certified. More than 15m3 of garbage has been sorted and sent for recycling and landfill.

Electrical works still continue tomorrow – few outside lights are missing, kitchen lights still need to be installed and the final certification of the electrical system is missing.

Today a water meter has been installed, tomorrow water closets and taps/showers will be installed, so that it is possible to start cleaning of the house.

Still two days to go before official inspection on Friday.

 

1 Comments so far ↓

  1. Oleg Gomzikov says:

    Looks great! I guess I will put also dark floors.. It is really easy and beautiful when You are installing and constructing EVERYTHING new. When doing re-modeling it is always f*(“#/(#/(“!)#/ problem having even one f*/(=”#)=”() item old, and on the other hand, changing everything co$t more than building n€w one from scratch.. :)

    Congratulations!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Leave a Comment