Today was the official inspection of the basic installation. Installation was completed one week ahead of schedule and there was just one minor note to the installation team. So now there are walls, windows, roof, and frame for the ceiling on the first floor.
Now the most interesting part begins – getting the house ready on the inside. Completion of the basic installation ahead of schedule gave an opportunity to make concrete floors before Christmas, let them dry up over the holidays and proceed with the rest of the works right after the New Year.
Yesterday cold water pipes and sewer pipes were connected and placed inside the house – where the showers, toilets and sinks will be. Today installation of styrox (thermal insulation) has been started.