This day has come!
I met with the installation crew few days ago – really nice guys from up north. Brought back all the memories about living in Oulu. They pointed out some things that still needed to be done before the house elements comes. Mostly small preparations – ordering scaffolds, ordering radon isolation for the top of the foundation wall and making sure that foundation for internal load bearing walls is made (been a bit of disappointment – contractor promised to do it a week ago, but didn’t show up).
Installation of the wall elements is done right from the truck they came on – speeds up the work quite a bit since there’s no need for arranging temporary storage and ordering a separate crane.
Installation of all elements and the roof is supposed to take about a month – so hopefully everyhitng is done before Christmas.