
Foundation is practically ready. Forms are taken away. A couple of small things are missing still – fixators for the columns, base for fireplace and base for internal load bearing walls. But that can be done a bit later as well, and now it is time to start bringing sand to bring the ground level to the planned height and install surface water system. There’s still a month to go before first truck from house factory arrives.