It took two weeks after the blunder with ground works was discovered to restart the foundation building. After all it was not that bad – we’ve discovered that neighbours got a permission to raise their house almost 70cm, so there was a chance to raise our house for another 10cm and put drainage pipes around projected garage and the house foundation locations.
First base of foundation had to be made. Installation team worked like a well-oiled machine – forms were assembled in a few hours. The only problem was that they were assembled in a slightly different place than where they were supposed to be. Inkoo construction inspector who came to check on the progress approved unplanned house location change. There was a bit of pressure to make decision fast, since trucks with concrete were already waiting. In the end of the day concrete was poured into the forms and base of foundation was ready. Yahoo!